Remodelling of female toilet facilities including new cubicle system, shower room and vanity unit, Polysafe PUR safety flooring, plumbing, and full redecoration, alongside the installation of fire-rated steel doors throughout the academy.

What Was Delivered

  • Flooring — Polysafe PUR safety flooring
  • New toilet cubicle system, shower room and vanity unit
  • Plumbing
  • Painting and decorating
  • Installation of steel fire doors

What Made This Project Complex

  • 01Completing the full toilet remodel and fire door installation within a 2-week programme
  • 02Coordinating plumbing, flooring, and cubicle installation trades in a confined space
  • 03Maintaining safe and hygienic conditions throughout the works on an occupied academy site

The Challenge

Delivering a complete toilet remodel and fire door installation programme within just 2 weeks on a live secondary academy site, requiring tight coordination of multiple trades in a confined area.

Our Approach

Clarke Lambert Construction sequenced the works to allow plumbing and structural elements to be completed first, followed by flooring, cubicle installation, and decoration. Fire door installation was carried out concurrently in adjacent areas to maximise efficiency within the 2-week window.

Verified Outcome

Fully remodelled female toilet facilities and new fire-rated steel doors installed on programme within 2 weeks, with no disruption to the academy's daily operations.