St. Chrysostom's C of E Primary School — EYFS Classroom Extension
Education12 weeks

St. Chrysostom's C of E Primary School — EYFS Classroom Extension

Client
St. Chrysostom's C of E Primary School
Location
Chorlton-on-Medlock, Greater Manchester
Duration
12 weeks
Client Type
Primary School
SafeContractor

Construction of a new EYFS classroom extension, including foundations, structural build, M&E installation, EYFS-specific internal fit-out, and external landscaping to create an outdoor learning area.

What Was Delivered

  • The installation of a TREMCO Flat Roofing System — carries a 20-year guarantee
  • Drainage
  • Suspended ceilings
  • Mechanical and electrical works
  • Flooring — Polysafe Astral PUR safety flooring and carpet tiles
  • Windows and doors
  • Kitchen re-fit
  • Recessed smart teaching wall
  • Altro Whiterock hygenic wall system
  • Excelsior washroom installation
  • Painting and decorating
  • External trespa meteron panels

What Made This Project Complex

  • 01Constructing a new extension adjacent to occupied classrooms
  • 02Maintaining safe access for EYFS children throughout the build
  • 03Tying the new extension into the existing building fabric without disrupting occupied areas

The Challenge

Constructing an EYFS extension on a constrained urban school site with young children in adjacent classrooms throughout the build programme.

Our Approach

The construction zone was fully hoarded with dedicated access routes. Structural works were concentrated during holiday periods, with internal fit-out continuing during term time. EYFS-specific finishes and fixtures were installed to meet early years standards.

Verified Outcome

EYFS extension completed within 12 weeks, providing a purpose-designed classroom and outdoor learning area for the school's youngest pupils.