Construction of a new multi-use games area (MUGA) providing three netball courts and ten pickleball courts, including full groundworks, drainage, 3,000 m² tarmac resurfacing, 280 linear metres of 3.6 m high chainlink fencing, and court line markings.

What Was Delivered

  • Groundworks
  • Drainage
  • Tarmac re-surfacing to 3,000 m²
  • 280 Lin.m of 3.6 m high chainlink fencing
  • Line markings for 3x netball courts and 10x pickleball courts

What Made This Project Complex

  • 01Completing the full MUGA construction within a 6-week programme
  • 02Coordinating drainage and tarmac trades to avoid rework
  • 03Installing 280 linear metres of fencing to precise alignment for court dimensions

The Challenge

Delivering a full multi-use games area on an occupied secondary academy site within a tight 6-week window, requiring careful sequencing of groundworks, drainage, surfacing, and fencing trades.

Our Approach

Clarke Lambert Construction phased the works to allow each trade to follow the previous without delay: groundworks and drainage first, followed immediately by tarmac resurfacing across the full 3,000 m², then fencing installation and finally court line markings. The programme was coordinated around the academy's timetable to minimise disruption to pupils.

Verified Outcome

New MUGA delivered on programme, providing Eaton Bank Academy with three netball courts and ten pickleball courts on a high-quality tarmac surface enclosed by 3.6 m chainlink fencing.